4928-30 CHRISTY BLVD
| Application date | Oct 29, 2026 |
|---|---|
| Issue date | Nov 17, 2026 |
| Days to issue | 19 |
| Estimated cost | $35,000 |
| Project type | Alteration |
| Structure type | 34 |
| First seen | 2026-11-18 12:41:47 |
Description
1. CONTRACTOR SHALL INSTALL NEW LOZIER FIXTURES<:PER THE FIXTURE PLAN, DRAWINGS, AND DETAILS AS<:SHOWN IN THIS SET. FIXTURES SHALL BE ANCHORED IN<:ACCORDANCE WITH PLANS. STORAGE HEIGHTS ARE<:LESS THAN 12'-0".<:NO HIGH PILE STORAGE IS USED FOR THIS STORE.<:2. CONTRACTOR SHALL INSTALL AND ANCHOR<:PRE-FABRICATED FITTING ROOM AS SHOWN IN<:DRAWINGS AND DETAILS.