STL Permits

← Back

4928-30 CHRISTY BLVD

Alteration Structure type 34 $35,000
Application dateOct 29, 2026
Issue dateNov 17, 2026
Days to issue19
Estimated cost$35,000
Project typeAlteration
Structure type34
First seen2026-11-18 12:41:47

Description

1. CONTRACTOR SHALL INSTALL NEW LOZIER FIXTURES<:PER THE FIXTURE PLAN, DRAWINGS, AND DETAILS AS<:SHOWN IN THIS SET. FIXTURES SHALL BE ANCHORED IN<:ACCORDANCE WITH PLANS. STORAGE HEIGHTS ARE<:LESS THAN 12'-0".<:NO HIGH PILE STORAGE IS USED FOR THIS STORE.<:2. CONTRACTOR SHALL INSTALL AND ANCHOR<:PRE-FABRICATED FITTING ROOM AS SHOWN IN<:DRAWINGS AND DETAILS.

Look up this address on stlouis-mo.gov →