4128-50 PAGE BLVD
| Application date | Nov 3, 2026 |
|---|---|
| Issue date | Nov 4, 2026 |
| Days to issue | 1 |
| Estimated cost | $64,000 |
| Project type | Alteration |
| Structure type | 34 |
| First seen | 2026-11-05 11:54:22 |
Description
Tuckpointing - the interior<:parapet wall<:Set up scaffolding to ensure that our crew can safely<:access the designated area for grinding and<:tuckpointing the interior of the parapet wall, the price<:includes the lose bricks that needs to be re-lay.<:Utilize vacuum systems during the grinding process<:to maintain a dust-free environment for both our<:clients and contractors.<:Tuckpointing - South wall Set up scaffolding to ensure that our crew can safely<:access the designated area for grinding and<:tuckpointing the entire the sections that needs to be<:done. THE SECTIONS HIGHLIGHTED IN BLUE<:ARE ALREADY COMPLETED. Utilize vacuum<:systems during the grinding process to maintain a<:dust-free environment for both our clients and<:contractors.<:Stone Foundation Re-<:Grouting- South wall<:Hammerdrill and Tuckpointing stone section. Please<:note: we are not able to use vacuums for these<:sections while hammer drilling. While we do our best<:to tarp up the area and prevent dust, there is no<:guarantee it will be a dust-free environment.<:Tuckpointing - East wall Set up scaffolding to ensure that our crew can safely<:access the designated area for grinding and<:tuckpointing the entire back all. Utilize vacuum<:systems during the grinding process to maintain a<:dust-free environment for both our clients and<:contractors.<:Stone Foundation Re-<:Grouting- East wall<:Hammerdrill and Tuckpointing stone section. Please<:note: we are not able to use vacuums for these<:sections while hammer drilling. While we do our best<:to tarp up the area and prevent dust, there is no<:guarantee it will be a dust-free environment.