5312 CHIPPEWA ST
| Application date | Oct 8, 2026 |
|---|---|
| Issue date | Oct 27, 2026 |
| Days to issue | 19 |
| Estimated cost | $24,000 |
| Project type | Alteration |
| Structure type | 34 |
| First seen | 2026-10-28 11:53:37 |
Description
Tear out existing bathroom, walls, tub toilet, terrazzo floor and old plumbing drains and vent lines. Install new tiled walk-in shower with new plumbing fixtures, waste lines, vent to code. Tile shower walls and floors, plaster finishes. and heated floor.