STL Permits

← Back

5312 CHIPPEWA ST

Alteration Structure type 34 $24,000
Application dateOct 8, 2026
Issue dateOct 27, 2026
Days to issue19
Estimated cost$24,000
Project typeAlteration
Structure type34
First seen2026-10-28 11:53:37

Description

Tear out existing bathroom, walls, tub toilet, terrazzo floor and old plumbing drains and vent lines. Install new tiled walk-in shower with new plumbing fixtures, waste lines, vent to code. Tile shower walls and floors, plaster finishes. and heated floor.

Look up this address on stlouis-mo.gov →