STL Permits

← Back

3634 WILMINGTON AV

Addition Structure type 25 $23,000
Application dateOct 12, 2026
Issue dateOct 26, 2026
Days to issue14
Estimated cost$23,000
Project typeAddition
Structure type25
First seen2026-10-27 11:53:31

Description

Retaining Wall Replacement with Corner Stairs<:Remove and dispose of the existing concrete retaining wall and footing along approximately 70 linear feet. Excavate behind<:the wall as needed to accommodate the new wall system and drainage backfill. Haul away demolition debris and excess<:excavated soil.<:Prepare and compact an aggregate base, then install approximately 70 linear feet of segmental retaining wall with an exposed<:height of approximately 3.5 feet. Include a buried base course and matching caps secured with masonry adhesive.<:Install clean drainage rock behind the wall, drainage fabric to separate soil from the stone, and a perforated drainage pipe at<:the base with discharge to a suitable outlet.<:Construct approximately 3-foot-wide stairs at the corner of the wall to provide access between the lower and upper elevations.<:Integrate the stairs with the adjoining walls on the right side and rear. Construct a stepped retaining wall return along the<:exposed left side to contain and support the stair base. Install matching caps on the stair treads and exposed return wall.<:Complete final grading immediately adjacent to the work area and remove construction debris.

Look up this address on stlouis-mo.gov →